transmission


With a view to evacuating the production of power plants that will be carried out as part of the equipment plan with production means for the 2018-2021 period, a major program for the development of the electricity transmission network has been undertaken. Indeed, the projects planned under this program are mainly:

  •  400 kV network

The connection of the Safi plant, the Tiskrad wind farm, the Noor MIDELT solar power station, and the connection of city of Dakhla to the grid.  

  •  225 kV network

Connection of the wind farms of, Taza, Midelt, Tangiers II, Jbel Lehdid, Boujdour Aftissat (13-09), and Boujdour,

Connection of the Noor Ouarzazate solar power plants (2, 3 and 4), the Laayoune PV solar power plant, and the Argana PV solar power plants,

Connection of the Abdelmoumen Plant for the Transfer of Energy by Pumping (S.T.E.P.).